Construction Site Porta Potty Rental in Cleburne
Jobsite toilets sized to the OSHA count for your crew, cleaned every week and billed every 28 days with no contract. Call when the job is done and billing stops at pickup.
Office open Mon–Sat, 7 a.m.–7 p.m.

- 1Delivery area
- Jobsites across Johnson County and about 80 miles out.
- 2Arrival
- Same day when you call by noon; Friday drop for a Monday start.
- 3Count
- 1 toilet for up to 20 workers under OSHA.
- 4Cleaning
- Pumped, scrubbed and restocked weekly, included.
- 5Cost
- From $165 per 28 days plus $45 delivery and pickup.
How many toilets does OSHA require on a jobsite?
OSHA requires at least 1 toilet for 20 or fewer workers. For 20 or more workers, OSHA requires 1 toilet seat and 1 urinal per 40 workers. For 200 or more, it is 1 seat and 1 urinal per 50 workers. The rule is OSHA 29 CFR 1926.51, Table D-1.
| Workers on site | OSHA minimum | Our recommendation (weekly service) |
|---|---|---|
| 1–10 | 1 toilet | 1 unit |
| 11–20 | 1 toilet | 2 units, or 1 unit serviced twice a week |
| 21–40 | 1 seat + 1 urinal | 3 units |
| 41–80 | 2 seats + 2 urinals | 5 units |
| 81–120 | 3 seats + 3 urinals | 7 units |
Legal minimum from OSHA Table D-1. Each standard unit has a seat and a urinal. Our recommendation adds capacity so units last a full week between services. Confirm any stricter rule with your GC or project owner.
Worked example: a framing crew of 14 works 50 hours a week. OSHA says 1 toilet. One unit fills up in about 4 days at that pace, so either rent 2 units or add a second weekly service for $55.
How does jobsite billing work?
Jobsite billing runs in 28-day cycles. The first invoice covers the unit for 28 days, weekly cleaning, and a one-time delivery and pickup charge. Each new cycle renews at the same price until you call for pickup. There is no long-term contract, and there is no removal fee at the end.
- Jobs of 1 to 7 days use the short-term rate instead of a full cycle.
- Contractor accounts can put several jobsites on one monthly statement.
- Moving a unit to a new jobsite counts as a new delivery.
What happens on each weekly service?
Each weekly service follows the same steps: pump the waste tank, scrub the seat, urinal, walls and floor, spray disinfectant, add fresh deodorizer, restock toilet paper and sanitizer, and check the door and vent. The tech logs the visit so you can show it to an inspector.
Service day is set at delivery, usually the same weekday. If the site will be locked, give a gate code or tell us which day to skip.



Where should a jobsite toilet go?
A jobsite toilet should sit on level ground within 30 feet of a truck path, close to where the crew works but away from trenches, material drops and crane swing areas. On new home sites, a spot near the curb keeps it serviceable after the driveway is poured.
Construction site toilets questions
Do I need a contract for a jobsite toilet?
No contract is needed. The unit renews every 28 days until you call for pickup.
I only need it for a week. Do I pay for 28 days?
A job of 7 days or less uses the short-term rate from $115 plus delivery. Past 7 days, the 28-day cycle is the better price.
Can you deliver Friday so it is there Monday morning?
Friday and Saturday deliveries for a Monday start are routine. Mark the spot and leave the gate open or send the code.
Do you stake units on windy sites?
Units on open lots, high slabs or windy ridges can be staked or strapped at delivery. Ask on the call.
What if a unit gets tipped or damaged on my site?
Tipping cleanup and damage are billed to the renter. Placing the unit away from equipment paths and staking it in wind prevents most problems.
Can I get the same tech and service day every week?
Service runs on a set weekday for each site, so the same route covers your job each week.
Starting a job Monday?
Call by Friday noon for Friday or Saturday delivery.