Industrial Portable Restroom Rental
Units for pad sites, pipelines, cement plants, quarries, warehouses and plant shutdowns, with OSHA-based counts and service up to several times a week.
Office open Mon–Sat, 7 a.m.–7 p.m.

- 1Delivery area
- Barnett Shale and industrial sites across our 80-mile area.
- 2Arrival
- Same day for urgent needs; scheduled for shutdowns.
- 3Count
- OSHA 1926.51 Table D-1 by crew size.
- 4Cleaning
- Weekly to daily, set by crew size.
- 5Cost
- Itemized per unit, per visit; account billing.
What do industrial sites need?
Industrial sites need enough toilets for the crew under OSHA Table D-1, handwashing where workers handle chemicals or coatings, a service schedule matched to shift counts, and a driver who knows site rules. Plant shutdowns can double a crew overnight, so counts must change with the schedule.
- Pad sites and pipelines: standard units on caliche pads, moved as the work moves.
- Cement plants and quarries: long-term units with twice-weekly service for dusty sites.
- Plant shutdowns and outages: banks of units set for the turnaround window, serviced daily.
- Warehouses: units during restroom outages or new construction.
How do shift crews change servicing?
Shift crews change servicing because two or three shifts use a unit two or three times as much. A unit rated for about 200 uses fills in days on a 24-hour site. Plan one service per shift day for heavy use, or add units so weekly service still works.
What site rules should the driver know?
Give the driver the gate location, check-in steps, PPE rules, speed limits and a site contact. Many plants and pad sites need a hard hat, vest and safety glasses. Our drivers carry standard PPE and follow site check-in.
Industrial portable restrooms questions
Do you serve Barnett Shale pad sites?
Pad sites across Johnson, Tarrant, Parker, Hood and Wise counties get standard units and handwashing on weekly or more frequent service.
Can you supply a plant shutdown on short notice?
Shutdowns are best scheduled 2 weeks ahead. Short-notice orders are filled from open inventory, so call as soon as dates are set.
Do you bill to a purchase order?
Industrial accounts can be billed every 28 days to a PO or job number.
Can units be moved as the job moves?
Units can be moved along a pipeline or between pads. Each move is billed as a relocation.
Ready to book?
Call by noon, Mon–Sat, for same-day delivery.